Betel Storage I (26INR0630)

Betel Storage I is a 500.0 MW other interconnection project in Milam, Texas with a current status of operational. It is proposed to connect at 3377 Little Pond Switch ( LTPSW) 345.

500.0 MWCapacity
OperationalStatus
MilamMarket
OtherTechnology

Project facts

Canonical nameBetel Storage I
Queue ID26INR0630
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMilam
TechnologyOther
Capacity500.0 MW
StateTexas
CountyMilam
Point of interconnection3377 Little Pond Switch ( LTPSW) 345
Requested (queue) date2025-01-28
Proposed in-service date
Operational date2026-08-12
Withdrawn date
DeveloperBETEL STORAGE II
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata