Betel Storage II is a 500.0 MW other interconnection project in Milam, Texas with a current status of operational. It is proposed to connect at 3377 Little Pond 345.

500.0 MWCapacity
OperationalStatus
MilamMarket
OtherTechnology

Project facts

Canonical nameBetel Storage II
Queue ID26INR0633
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMilam
TechnologyOther
Capacity500.0 MW
StateTexas
CountyMilam
Point of interconnection3377 Little Pond 345
Requested (queue) date2025-01-28
Proposed in-service date
Operational date2026-12-17
Withdrawn date
DeveloperBETEL STORAGE II
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata