BETHEL 7 & 8 SOLAR THERMAL HYBRID PROJECT (283)

BETHEL 7 & 8 SOLAR THERMAL HYBRID PROJECT is a 106.8 MW gas interconnection project in Fresno, California with a current status of withdrawn. It is proposed to connect at Gates Substation 230kV bus.

106.8 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameBETHEL 7 & 8 SOLAR THERMAL HYBRID PROJECT
Queue ID283
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity106.8 MW
StateCalifornia
CountyFresno
Point of interconnectionGates Substation 230kV bus
Requested (queue) date2007-12-12
Proposed in-service date
Operational date
Withdrawn date2011-04-12
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.