Bethlehem Energy Center Uprate (C24-314)

Bethlehem Energy Center Uprate is a 926.1 MW gas interconnection project in Albany, New York with a current status of withdrawn. It is proposed to connect at Albany Steam Station, Jawside of 6177, 6277, 6377, 6477 Disconnects.

926.1 MWCapacity
WithdrawnStatus
NYISOMarket
GasTechnology

Project facts

Canonical nameBethlehem Energy Center Uprate
Queue IDC24-314
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyGas
Capacity926.1 MW
StateNew York
CountyAlbany
Point of interconnectionAlbany Steam Station, Jawside of 6177, 6277, 6377, 6477 Disconnects
Requested (queue) date2024-10-03
Proposed in-service date
Operational date
Withdrawn date
DeveloperGB II New York LLC
Utility / transmission ownerNM-NG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata