Between Substation 1209 and 1252; 161kV (GEN-2020-045)

Between Substation 1209 and 1252; 161kV is a 56.5 MW gas interconnection project in Douglas County, Nebraska with a current status of operational. It is proposed to connect at Between Substation 1209 and 1252; 161kV.

56.5 MWCapacity
OperationalStatus
NEMarket
GasTechnology

Project facts

Canonical nameBetween Substation 1209 and 1252; 161kV
Queue IDGEN-2020-045
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketNE
TechnologyGas
Capacity56.5 MW
StateNebraska
CountyDouglas County
Point of interconnectionBetween Substation 1209 and 1252; 161kV
Requested (queue) date2020-04-29
Proposed in-service date
Operational date2023-04-30
Withdrawn date
Developer
Utility / transmission ownerOPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata