Beverly Park Expansion (L0273)

Beverly Park Expansion is a 178.0 MW other interconnection project in Snohomish, Washington with a current status of withdrawn. It is proposed to connect at Snohomish Substation.

178.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameBeverly Park Expansion
Queue IDL0273
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity178.0 MW
StateWashington
CountySnohomish
Point of interconnectionSnohomish Substation
Requested (queue) date2007-05-25
Proposed in-service date2008-10-01
Operational date
Withdrawn date
DeveloperPublic Utility District No. 1 of Cowlitz County
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.