Biers Run-Circleville 138kV (AD2-162)

Biers Run-Circleville 138kV is a 110.0 MW solar interconnection project in Pickaway, Ohio with a current status of withdrawn.

110.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameBiers Run-Circleville 138kV
Queue IDAD2-162
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity110.0 MW
StateOhio
CountyPickaway
Point of interconnection—
Requested (queue) date2018-03-27
Proposed in-service date2025-05-31
Operational date—
Withdrawn date2023-06-21
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.