Big Canyon Wind (30INR0018)

Big Canyon Wind is a 1,500.0 MW other interconnection project in Pecos, Texas with a current status of operational. It is proposed to connect at 38441 Bottlebrush 345kV.

1,500.0 MWCapacity
OperationalStatus
PecosMarket
OtherTechnology

Project facts

Canonical nameBig Canyon Wind
Queue ID30INR0018
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketPecos
TechnologyOther
Capacity1,500.0 MW
StateTexas
CountyPecos
Point of interconnection38441 Bottlebrush 345kV
Requested (queue) date2025-01-13
Proposed in-service date
Operational date2030-07-01
Withdrawn date
DeveloperLongfellow Wind, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata