Big Sandy 230 Substation (GI-CS-2025-11)

Big Sandy 230 Substation is a 199.0 MW wind interconnection project in Lincoln County,, Colorado with a current status of active. It is proposed to connect at Big Sandy 230 Substation.

199.0 MWCapacity
ActiveStatus
COMarket
WindTechnology

Project facts

Canonical nameBig Sandy 230 Substation
Queue IDGI-CS-2025-11
Statusactive
Source statusFACILITY STUDY STAGE
MarketCO
TechnologyWind
Capacity199.0 MW
StateColorado
CountyLincoln County,
Point of interconnectionBig Sandy 230 Substation
Requested (queue) date2025-09-19
Proposed in-service date2028-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; tristate-oasis. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-22operational_date2028-12-01—medium
2026-09-22proposed_online_date—2028-12-01medium
2026-09-22statusoperationalactivehigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata