Big Sandy-Inez 138 kV (AG2-685)

Big Sandy-Inez 138 kV is a 150.0 MW solar interconnection project in Martin, Kentucky with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBig Sandy-Inez 138 kV
Queue IDAG2-685
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateKentucky
CountyMartin
Point of interconnection
Requested (queue) date2021-03-31
Proposed in-service date2024-06-01
Operational date
Withdrawn date2024-12-18
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.