Big Sandy - Windtalker 230 Line (GI-CS-2025-24)
Big Sandy - Windtalker 230 Line is a 225.0 MW wind interconnection project in Kit Carson County,, Colorado with a current status of operational. It is proposed to connect at Big Sandy - Windtalker 230 Line.
225.0 MWCapacity
OperationalStatus
COMarket
WindTechnology
Project facts
| Canonical name | Big Sandy - Windtalker 230 Line |
|---|---|
| Queue ID | GI-CS-2025-24 |
| Status | operational |
| Source status | DISIS STAGE |
| Market | CO |
| Technology | Wind |
| Capacity | 225.0 MW |
| State | Colorado |
| County | Kit Carson County, |
| Point of interconnection | Big Sandy - Windtalker 230 Line |
| Requested (queue) date | 2025-09-29 |
| Proposed in-service date | — |
| Operational date | 2029-12-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | TSGT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; tristate-oasis. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata