Big Star Solar (21INR0413)

Big Star Solar is a 203.1 MW solar interconnection project in Bastrop, Texas with a current status of operational. It is proposed to connect at Tap 345kV 9074 Lytton - 9073 Holman.

203.1 MWCapacity
OperationalStatus
BastropMarket
SolarTechnology

Project facts

Canonical nameBig Star Solar
Queue ID21INR0413
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketBastrop
TechnologySolar
Capacity203.1 MW
StateTexas
CountyBastrop
Point of interconnectionTap 345kV 9074 Lytton - 9073 Holman
Requested (queue) date2019-08-27
Proposed in-service date
Operational date2026-01-31
Withdrawn date
DeveloperRWE Solar Development, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata