Big Stone South 230KV Substation (J3183)

Big Stone South 230KV Substation is a 125.0 MW solar interconnection project in Grant, South Dakota with a current status of withdrawn. It is proposed to connect at Big Stone South 230KV Substation.

125.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBig Stone South 230KV Substation
Queue IDJ3183
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity125.0 MW
StateSouth Dakota
CountyGrant
Point of interconnectionBig Stone South 230KV Substation
Requested (queue) date2022-09-15
Proposed in-service date2027-06-01
Operational date2027-06-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerOtter Tail Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.