Big Stone South substation, Big Stone City (J721)

Big Stone South substation, Big Stone City is a 200.0 MW wind interconnection project in Codington County,Deuel County, South Dakota with a current status of withdrawn. It is proposed to connect at Big Stone South substation, Big Stone City.

200.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameBig Stone South substation, Big Stone City
Queue IDJ721
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity200.0 MW
StateSouth Dakota
CountyCodington County,Deuel County
Point of interconnectionBig Stone South substation, Big Stone City
Requested (queue) date2016-10-24
Proposed in-service date2019-09-15
Operational date2019-09-15
Withdrawn date2019-08-09
Developer
Utility / transmission ownerOtter Tail Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata