Bigway Solar II (27INR0128)

Bigway Solar II is a 206.0 MW solar interconnection project in King, Texas with a current status of operational. It is proposed to connect at Tap 345KV #59904 Cottonwood - #60500 Edith Clarke Ckt #2.

206.0 MWCapacity
OperationalStatus
KingMarket
SolarTechnology

Project facts

Canonical nameBigway Solar II
Queue ID27INR0128
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketKing
TechnologySolar
Capacity206.0 MW
StateTexas
CountyKing
Point of interconnectionTap 345KV #59904 Cottonwood - #60500 Edith Clarke Ckt #2
Requested (queue) date2023-12-20
Proposed in-service date
Operational date2027-12-31
Withdrawn date
DeveloperNextera
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata