Billerica Power (157)

Billerica Power is a 311.0 MW gas interconnection project in Middlesex, Massachusetts with a current status of withdrawn. It is proposed to connect at J-162 line to Tewksbury Substation.

311.0 MWCapacity
WithdrawnStatus
CMAMarket
GasTechnology

Project facts

Canonical nameBillerica Power
Queue ID157
Statuswithdrawn
Source statusW
MarketCMA
TechnologyGas
Capacity311.0 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionJ-162 line to Tewksbury Substation
Requested (queue) date2006-06-21
Proposed in-service date2011-06-15
Operational date
Withdrawn date2009-12-29
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata