Biomass Project ( Also see queue position #223) (218)

Biomass Project ( Also see queue position #223) is a 62.0 MW other interconnection project in Berkshire, Massachusetts with a current status of withdrawn. It is proposed to connect at Doreen 115 kV substation or F132 115 kV line.

62.0 MWCapacity
WithdrawnStatus
WMAMarket
OtherTechnology

Project facts

Canonical nameBiomass Project ( Also see queue position #223)
Queue ID218
Statuswithdrawn
Source statusW
MarketWMA
TechnologyOther
Capacity62.0 MW
StateMassachusetts
CountyBerkshire
Point of interconnectionDoreen 115 kV substation or F132 115 kV line
Requested (queue) date2007-06-27
Proposed in-service date2010-12-01
Operational date
Withdrawn date2009-01-30
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata