Biomass Project (282)

Biomass Project is a 49.7 MW other interconnection project in Franklin, Massachusetts with a current status of withdrawn. It is proposed to connect at 115 kV line near Montage or Fench King substations.

49.7 MWCapacity
WithdrawnStatus
WMAMarket
OtherTechnology

Project facts

Canonical nameBiomass Project
Queue ID282
Statuswithdrawn
Source statusW
MarketWMA
TechnologyOther
Capacity49.7 MW
StateMassachusetts
CountyFranklin
Point of interconnection115 kV line near Montage or Fench King substations
Requested (queue) date2008-10-15
Proposed in-service date2014-02-01
Operational date
Withdrawn date2011-06-28
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.