Birch Data Center (L0496)

Birch Data Center is a 150.0 MW other interconnection project in Yamhill, Oregon with a current status of withdrawn. It is proposed to connect at Keeler/Forest Grove 115 #1 & 2.

150.0 MWCapacity
WithdrawnStatus
ORMarket
OtherTechnology

Project facts

Canonical nameBirch Data Center
Queue IDL0496
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyOther
Capacity150.0 MW
StateOregon
CountyYamhill
Point of interconnectionKeeler/Forest Grove 115 #1 & 2
Requested (queue) date2021-07-26
Proposed in-service date2023-03-31
Operational date
Withdrawn date
DeveloperCity of Forest Grove
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.