Bishop Ranch - BR 3-GG (69706_4149C)

Bishop Ranch - BR 3-GG is a 1.1 MW solar interconnection project in Contra Costa, California with a current status of active.

1.1 MWCapacity
ActiveStatus
CISOMarket
SolarTechnology

Project facts

Canonical nameBishop Ranch - BR 3-GG
Queue ID69706_4149C
Statusactive
Source status(V) Under construction, more than 50 percent complete
MarketCISO
TechnologySolar
Capacity1.1 MW
StateCalifornia
CountyContra Costa
Point of interconnection
Requested (queue) date
Proposed in-service date2027-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerCamino Ramon BR 3-FF Solar Project 2020, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata