BLACK BEAR ENERGY STORAGE 1 (1731)

BLACK BEAR ENERGY STORAGE 1 is a 100.0 MW battery interconnection project in San Luis Obispo, California with a current status of withdrawn. It is proposed to connect at Mesa Substation 115kV.

100.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameBLACK BEAR ENERGY STORAGE 1
Queue ID1731
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity100.0 MW
StateCalifornia
CountySan Luis Obispo
Point of interconnectionMesa Substation 115kV
Requested (queue) date2020-04-15
Proposed in-service date
Operational date
Withdrawn date2021-05-28
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata