Black Hawk Solar (28INR0040)

Black Hawk Solar is a 251.3 MW solar interconnection project in Duval, Texas with a current status of operational. It is proposed to connect at San Miguel (5901) - Cruce (80079) double circuit transmission line. Requesting interconnection to both lines on the double circuit. This is a planned double circuit with ISD of 2027. .

251.3 MWCapacity
OperationalStatus
DuvalMarket
SolarTechnology

Project facts

Canonical nameBlack Hawk Solar
Queue ID28INR0040
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketDuval
TechnologySolar
Capacity251.3 MW
StateTexas
CountyDuval
Point of interconnectionSan Miguel (5901) - Cruce (80079) double circuit transmission line. Requesting interconnection to both lines on the double circuit. This is a planned double circuit with ISD of 2027.
Requested (queue) date2024-02-27
Proposed in-service date
Operational date2030-12-31
Withdrawn date
DeveloperACE DEVCO NC, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata