Black Hill Point Energy Center (787)

Black Hill Point Energy Center is a 19.9 MW solar interconnection project in Windham, Connecticut with a current status of withdrawn. It is proposed to connect at New 3 breaker ring bus switching station on Eversource (CL&P) Killingly to Tunnel 115 kV line L-1607..

19.9 MWCapacity
WithdrawnStatus
CTMarket
SolarTechnology

Project facts

Canonical nameBlack Hill Point Energy Center
Queue ID787
Statuswithdrawn
Source statusW
MarketCT
TechnologySolar
Capacity19.9 MW
StateConnecticut
CountyWindham
Point of interconnectionNew 3 breaker ring bus switching station on Eversource (CL&P) Killingly to Tunnel 115 kV line L-1607.
Requested (queue) date2018-09-26
Proposed in-service date2025-09-25
Operational date
Withdrawn date2024-11-27
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata