Black Mountain Somervell Gas Combined (27INR0497)

Black Mountain Somervell Gas Combined is a 495.3 MW gas interconnection project in Somervell, Texas with a current status of operational. It is proposed to connect at Dinosaur Switch (#15208).

495.3 MWCapacity
OperationalStatus
SomervellMarket
GasTechnology

Project facts

Canonical nameBlack Mountain Somervell Gas Combined
Queue ID27INR0497
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketSomervell
TechnologyGas
Capacity495.3 MW
StateTexas
CountySomervell
Point of interconnectionDinosaur Switch (#15208)
Requested (queue) date2025-04-21
Proposed in-service date
Operational date2029-09-28
Withdrawn date
DeveloperFort Worth Power Core LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata