Black Oak-Hatfield 500 kV (AG1-363)

Black Oak-Hatfield 500 kV is a 300.0 MW solar interconnection project in Garrett, Maryland with a current status of active.

300.0 MWCapacity
ActiveStatus
—Market
SolarTechnology

Project facts

Canonical nameBlack Oak-Hatfield 500 kV
Queue IDAG1-363
Statusactive
Source statusEngineering and Procurement
Market—
TechnologySolar
Capacity300.0 MW
StateMaryland
CountyGarrett
Point of interconnection—
Requested (queue) date2020-09-30
Proposed in-service date2029-03-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-07proposed_online_date2028-03-312029-03-31medium
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata