Black Oak Wind (0398)

Black Oak Wind is a 12.5 MW wind interconnection project in Thompkins, New York with a current status of withdrawn. It is proposed to connect at Montour - Coddington 115kV.

12.5 MWCapacity
WithdrawnStatus
CMarket
WindTechnology

Project facts

Canonical nameBlack Oak Wind
Queue ID0398
Statuswithdrawn
Source status0
MarketC
TechnologyWind
Capacity12.5 MW
StateNew York
CountyThompkins
Point of interconnectionMontour - Coddington 115kV
Requested (queue) date2013-01-10
Proposed in-service date2017-08-31
Operational date
Withdrawn date
DeveloperBlack Oak Wind Farm, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata