BLACK ROCK 1,2,3,4, & 5,6 (677)

BLACK ROCK 1,2,3,4, & 5,6 is a 470.0 MW gas interconnection project in Imperial, California with a current status of withdrawn. It is proposed to connect at Imperial Valley Sub.

470.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameBLACK ROCK 1,2,3,4, & 5,6
Queue ID677
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity470.0 MW
StateCalifornia
CountyImperial
Point of interconnectionImperial Valley Sub
Requested (queue) date2011-03-31
Proposed in-service date
Operational date
Withdrawn date2012-03-20
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata