Black Tulip Storage is a 60.0 MW battery interconnection project in Cambria, Pennsylvania with a current status of withdrawn. It is proposed to connect at Rachel Hill 115 kV.

60.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical nameBlack Tulip Storage
Queue IDAH1-462
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity60.0 MW
StatePennsylvania
CountyCambria
Point of interconnectionRachel Hill 115 kV
Requested (queue) date2021-09-11
Proposed in-service date2024-12-31
Operational date
Withdrawn date2025-02-12
DeveloperBlack Tulip Energy, LLC
Utility / transmission ownerPENELEC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata