Blackberry - Neosho 345kV line (GEN-2017-189)

Blackberry - Neosho 345kV line is a 201.6 MW solar interconnection project in Jasper, Missouri with a current status of withdrawn. It is proposed to connect at Blackberry - Neosho 345kV line.

201.6 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology

Project facts

Canonical nameBlackberry - Neosho 345kV line
Queue IDGEN-2017-189
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologySolar
Capacity201.6 MW
StateMissouri
CountyJasper
Point of interconnectionBlackberry - Neosho 345kV line
Requested (queue) date2017-11-30
Proposed in-service date
Operational date
Withdrawn date2022-03-15
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata