Jasper County, Missouri — Interconnection Projects
The interXdata warehouse tracks 29 interconnection projects in Jasper, Missouri, representing 2,339 MW of requested capacity.
29Total projects
3Active
18Operational
8Withdrawn
2,339 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 8 | 1,070 MW |
| Solar | 6 | 602 MW |
| Battery | 4 | 475 MW |
| Wind | 2 | 150 MW |
| Other | 9 | 42 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| State Line Combined Cycle | 7296_2-3 | Gas | 206.5 MW | operational | Jasper, Missouri |
| Blackberry - Neosho 345kV line | GEN-2017-189 | Solar | 201.6 MW | withdrawn | Jasper, Missouri |
| La Russell 161 kV Substation | GEN-2023-226 | Battery | 200.0 MW | withdrawn | Jasper, Missouri |
| State Line Combined Cycle | 7296_2-1 | Gas | 181.0 MW | operational | Jasper, Missouri |
| State Line Combined Cycle | 7296_2-2 | Gas | 180.0 MW | operational | Jasper, Missouri |
| La Russell 161 kV Substation | GEN-2020-088 | Solar | 150.0 MW | active | Jasper, Missouri |
| Asbury 161 kV Substation | GEN-2021-059 | Solar | 130.0 MW | withdrawn | Jasper, Missouri |
| Empire Energy Center | 6223_2 | Gas | 129.0 MW | operational | Jasper, Missouri |
| Empire Energy Center | 6223_1 | Gas | 129.0 MW | operational | Jasper, Missouri |
| State Line Combined Cycle | 7296_1 | Gas | 123.0 MW | operational | Jasper, Missouri |
| Foxtrot Solar Energy LLC | 69481_FXTRT | Solar | 107.0 MW | active | Jasper, Missouri |
| Carthage 161 kV Substation | GEN-2023-061 | Battery | 100.0 MW | active | Jasper, Missouri |
| 145 JOPLIN WEST 7TH 161 kV Substation | GEN-2024-091 | Battery | 100.0 MW | withdrawn | Jasper, Missouri |
| Kelly 161kV Substation | GEN-2018-053 | Wind | 100.0 MW | withdrawn | Jasper, Missouri |
| Joplin 389 and Silver Creek 469 161 kV Line | GEN-2023-233 | Battery | 74.9 MW | withdrawn | Jasper, Missouri |
| Empire Energy Center | 6223_4 | Gas | 60.5 MW | operational | Jasper, Missouri |
| Empire Energy Center | 6223_3 | Gas | 60.5 MW | operational | Jasper, Missouri |
| Kelly 161kV Substation | GEN-2018-061 | Wind | 50.0 MW | withdrawn | Jasper, Missouri |
| POI-Galena 69 kV interconnection substation through a 0.50 mile 69 kV gen-tie line | GEN-2022-084 | Solar | 11.4 MW | withdrawn | Jasper, Missouri |
| Carthage | 2121_10 | Other | 7.0 MW | operational | Jasper, Missouri |
| Carthage | 2121_14 | Other | 6.0 MW | operational | Jasper, Missouri |
| Carthage | 2121_13 | Other | 6.0 MW | operational | Jasper, Missouri |
| Carthage | 2121_9 | Other | 5.0 MW | operational | Jasper, Missouri |
| Carthage | 2121_12 | Other | 4.5 MW | operational | Jasper, Missouri |
| Carthage | 2121_11 | Other | 4.5 MW | operational | Jasper, Missouri |
| Carthage | 2121_8 | Other | 3.3 MW | operational | Jasper, Missouri |
| Carthage | 2121_7 | Other | 3.0 MW | operational | Jasper, Missouri |
| Carthage | 2121_6 | Other | 2.5 MW | operational | Jasper, Missouri |
| Prosperity Solar Farm CSG | 64225_PROS1 | Solar | 2.3 MW | operational | Jasper, Missouri |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Jasper County.
Start tracking with interXdata