Jasper County, Missouri — Interconnection Projects

The interXdata warehouse tracks 29 interconnection projects in Jasper, Missouri, representing 2,340 MW of requested capacity.

29Total projects
3Active
18Operational
8Withdrawn
2,340 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas171,111 MW
Solar6604 MW
Battery4475 MW
Wind2150 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
State Line Combined Cycle7296_2-3Gas206.5 MWoperationalJasper, Missouri
Blackberry - Neosho 345kV lineGEN-2017-189Solar201.6 MWwithdrawnJasper, Missouri
La Russell 161 kV SubstationGEN-2023-226Battery200.0 MWwithdrawnJasper, Missouri
State Line Combined Cycle7296_2-1Gas181.0 MWoperationalJasper, Missouri
State Line Combined Cycle7296_2-2Gas180.0 MWoperationalJasper, Missouri
La Russell 161 kV SubstationGEN-2020-088Solar150.0 MWactiveJasper, Missouri
Asbury 161 kV SubstationGEN-2021-059Solar130.0 MWwithdrawnJasper, Missouri
Empire Energy Center6223_2Gas129.0 MWoperationalJasper, Missouri
Empire Energy Center6223_1Gas129.0 MWoperationalJasper, Missouri
State Line Combined Cycle7296_1Gas123.0 MWoperationalJasper, Missouri
Foxtrot Solar Energy LLC69481_FXTRTSolar108.9 MWactiveJasper, Missouri
Kelly 161kV SubstationGEN-2018-053Wind100.0 MWwithdrawnJasper, Missouri
Carthage 161 kV SubstationGEN-2023-061Battery100.0 MWactiveJasper, Missouri
145 JOPLIN WEST 7TH 161 kV SubstationGEN-2024-091Battery100.0 MWwithdrawnJasper, Missouri
Joplin 389 and Silver Creek 469 161 kV LineGEN-2023-233Battery74.9 MWwithdrawnJasper, Missouri
Empire Energy Center6223_4Gas60.5 MWoperationalJasper, Missouri
Empire Energy Center6223_3Gas60.5 MWoperationalJasper, Missouri
Kelly 161kV SubstationGEN-2018-061Wind50.0 MWwithdrawnJasper, Missouri
POI-Galena 69 kV interconnection substation through a 0.50 mile 69 kV gen-tie lineGEN-2022-084Solar11.4 MWwithdrawnJasper, Missouri
Carthage2121_10Gas7.0 MWoperationalJasper, Missouri
Carthage2121_13Gas6.0 MWoperationalJasper, Missouri
Carthage2121_14Gas6.0 MWoperationalJasper, Missouri
Carthage2121_9Gas5.0 MWoperationalJasper, Missouri
Carthage2121_12Gas4.5 MWoperationalJasper, Missouri
Carthage2121_11Gas4.5 MWoperationalJasper, Missouri
Carthage2121_8Gas3.3 MWoperationalJasper, Missouri
Carthage2121_7Gas3.0 MWoperationalJasper, Missouri
Carthage2121_6Gas2.5 MWoperationalJasper, Missouri
Prosperity Solar Farm CSG64225_PROS1Solar2.3 MWoperationalJasper, Missouri

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.