Blackford County Solar (AG1-375)
Blackford County Solar is a 100.0 MW solar interconnection project in Blackford, Indiana with a current status of withdrawn. It is proposed to connect at Sorenson-Desoto 345 kV.
100.0 MWCapacity
WithdrawnStatus
PJMMarket
SolarTechnology
Project facts
| Canonical name | Blackford County Solar |
|---|---|
| Queue ID | AG1-375 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | PJM |
| Technology | Solar |
| Capacity | 100.0 MW |
| State | Indiana |
| County | Blackford |
| Point of interconnection | Sorenson-Desoto 345 kV |
| Requested (queue) date | 2020-09-30 |
| Proposed in-service date | 2024-10-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Blackford County Wind Farm LLC d/b/a Blackford County Solar Park LLC |
| Utility / transmission owner | AEP |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata