Blanquilla BESS (24INR0528)

Blanquilla BESS is a 200.8 MW other interconnection project in Nueces, Texas with a current status of operational. It is proposed to connect at Tap 138kV 8452 LON_HILL4A - 8441 NUECES_B4A .

200.8 MWCapacity
OperationalStatus
NuecesMarket
OtherTechnology

Project facts

Canonical nameBlanquilla BESS
Queue ID24INR0528
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketNueces
TechnologyOther
Capacity200.8 MW
StateTexas
CountyNueces
Point of interconnectionTap 138kV 8452 LON_HILL4A - 8441 NUECES_B4A
Requested (queue) date2023-02-09
Proposed in-service date
Operational date2027-12-15
Withdrawn date
DeveloperBlanquilla BESS LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata