Blarney Solar (24INR0326)

Blarney Solar is a 81.5 MW solar interconnection project in Hopkins, Texas with a current status of operational. It is proposed to connect at 138 kV Ridgeway Switch.

81.5 MWCapacity
OperationalStatus
HopkinsMarket
SolarTechnology

Project facts

Canonical nameBlarney Solar
Queue ID24INR0326
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketHopkins
TechnologySolar
Capacity81.5 MW
StateTexas
CountyHopkins
Point of interconnection138 kV Ridgeway Switch
Requested (queue) date2022-07-05
Proposed in-service date
Operational date2027-10-01
Withdrawn date
DeveloperBlarney Solar Project LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata