Blue Energy Center - Port of Victoria Phase 1b – CCGT (29INR0248)
Blue Energy Center - Port of Victoria Phase 1b – CCGT is a 1,110.0 MW gas interconnection project in Victoria, Texas with a current status of operational. It is proposed to connect at Tap <345kV> <#80286> <DULCE7A> - <#8676> <STATIC7A>.
1,110.0 MWCapacity
OperationalStatus
VictoriaMarket
GasTechnology
Project facts
| Canonical name | Blue Energy Center - Port of Victoria Phase 1b – CCGT |
|---|---|
| Queue ID | 29INR0248 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Victoria |
| Technology | Gas |
| Capacity | 1,110.0 MW |
| State | Texas |
| County | Victoria |
| Point of interconnection | Tap <345kV> <#80286> <DULCE7A> - <#8676> <STATIC7A> |
| Requested (queue) date | 2026-01-26 |
| Proposed in-service date | — |
| Operational date | 2031-10-17 |
| Withdrawn date | — |
| Developer | Brother 1, LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-30 | capacity_mw | 1264.6 | 1110 | high |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata