Blue Frost (1604)

Blue Frost is a 400.0 MW battery interconnection project in Montgomery, New York with a current status of withdrawn. It is proposed to connect at Marcy - New Scotland 345 kV.

400.0 MWCapacity
WithdrawnStatus
EMarket
BatteryTechnology

Project facts

Canonical nameBlue Frost
Queue ID1604
Statuswithdrawn
Source status0
MarketE
TechnologyBattery
Capacity400.0 MW
StateNew York
CountyMontgomery
Point of interconnectionMarcy - New Scotland 345 kV
Requested (queue) date2023-09-05
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperBlue Frost Energy Center, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata