Blue Jay Solar II (21INR0538)

Blue Jay Solar II is a 69.0 MW solar interconnection project in Grimes, Texas with a current status of operational. It is proposed to connect at 4 Iola 138kV.

69.0 MWCapacity
OperationalStatus
GrimesMarket
SolarTechnology

Project facts

Canonical nameBlue Jay Solar II
Queue ID21INR0538
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketGrimes
TechnologySolar
Capacity69.0 MW
StateTexas
CountyGrimes
Point of interconnection4 Iola 138kV
Requested (queue) date2021-04-13
Proposed in-service date
Operational date2025-10-31
Withdrawn date
DeveloperBlue Jay Solar I, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.