Blue Lake BESS (70098_BEB)

Blue Lake BESS is a 135.5 MW battery interconnection project in Scott, Minnesota with a current status of active.

135.5 MWCapacity
ActiveStatus
MISOMarket
BatteryTechnology

Project facts

Canonical nameBlue Lake BESS
Queue ID70098_BEB
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketMISO
TechnologyBattery
Capacity135.5 MW
StateMinnesota
CountyScott
Point of interconnection
Requested (queue) date
Proposed in-service date2027-05-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata