Blue Lake - MCLEOD (GRE) 230.0kV (J4060)

Blue Lake - MCLEOD (GRE) 230.0kV is a 129.0 MW battery interconnection project in McLeod, Minnesota with a current status of withdrawn. It is proposed to connect at Blue Lake - MCLEOD (GRE) 230.0kV.

129.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameBlue Lake - MCLEOD (GRE) 230.0kV
Queue IDJ4060
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity129.0 MW
StateMinnesota
CountyMcLeod
Point of interconnectionBlue Lake - MCLEOD (GRE) 230.0kV
Requested (queue) date2025-08-20
Proposed in-service date2030-12-01
Operational date2030-12-01
Withdrawn date2026-01-02
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata