Blue Mount tap on the Pana-Route 51D-1462 138kV line is a 200.0 MW wind interconnection project in Macon County, Illinois with a current status of withdrawn. It is proposed to connect at Blue Mount tap on the Pana-Route 51D-1462 138kV line.

200.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameBlue Mount tap on the Pana-Route 51D-1462 138kV line
Queue IDJ872
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity200.0 MW
StateIllinois
CountyMacon County
Point of interconnectionBlue Mount tap on the Pana-Route 51D-1462 138kV line
Requested (queue) date2017-06-16
Proposed in-service date2020-09-01
Operational date2020-09-01
Withdrawn date2019-01-08
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata