Blue River 138 kV (GEN-2014-014)

Blue River 138 kV is a 149.5 MW wind interconnection project in Pontotoc, Oklahoma with a current status of withdrawn. It is proposed to connect at Blue River 138 kV.

149.5 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameBlue River 138 kV
Queue IDGEN-2014-014
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity149.5 MW
StateOklahoma
CountyPontotoc
Point of interconnectionBlue River 138 kV
Requested (queue) date2014-06-20
Proposed in-service date
Operational date
Withdrawn date2014-09-25
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata