Pontotoc County, Oklahoma — Interconnection Projects

The interXdata warehouse tracks 6 interconnection projects in Pontotoc, Oklahoma, representing 740 MW of requested capacity.

6Total projects
1Active
2Operational
3Withdrawn
740 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind3444 MW
Solar3295 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
OG&E's Blue River 138kV SubstationGEN-2021-091Solar150.0 MWwithdrawnPontotoc, Oklahoma
Blue River 138 kVGEN-2014-014Wind149.5 MWwithdrawnPontotoc, Oklahoma
Pontotoc Wind67224_20101Wind147.5 MWoperationalPontotoc, Oklahoma
Blue River 138kVGEN-2016-102Wind147.5 MWactivePontotoc, Oklahoma
Allen NG4 138 kV SubstationGEN-2023-152Solar140.0 MWwithdrawnPontotoc, Oklahoma
People's68711_PEOPLSolar5.0 MWoperationalPontotoc, Oklahoma

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.