Blue Sage Wind (30INR0135)
Blue Sage Wind is a 394.1 MW other interconnection project in Andrews, Texas with a current status of active. It is proposed to connect at BUS #11270 - DOGHOUSE_5 - THE DOGHOUSE 345kV SUBSTATION.
394.1 MWCapacity
ActiveStatus
AndrewsMarket
OtherTechnology
Project facts
| Canonical name | Blue Sage Wind |
|---|---|
| Queue ID | 30INR0135 |
| Status | active |
| Source status | SS Started, FIS Started, No IA |
| Market | Andrews |
| Technology | Other |
| Capacity | 394.1 MW |
| State | Texas |
| County | Andrews |
| Point of interconnection | BUS #11270 - DOGHOUSE_5 - THE DOGHOUSE 345kV SUBSTATION |
| Requested (queue) date | 2026-07-22 |
| Proposed in-service date | 2030-04-04 |
| Operational date | — |
| Withdrawn date | — |
| Developer | CPV Valley, LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-31 | new_project | — | active | high |
Explore related data
Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata