Blue Star Solar (0753)

Blue Star Solar is a 100.0 MW solar interconnection project in Washington, New York with a current status of withdrawn. It is proposed to connect at Mohican - Luther Forest 115kV.

100.0 MWCapacity
WithdrawnStatus
FMarket
SolarTechnology

Project facts

Canonical nameBlue Star Solar
Queue ID0753
Statuswithdrawn
Source status0
MarketF
TechnologySolar
Capacity100.0 MW
StateNew York
CountyWashington
Point of interconnectionMohican - Luther Forest 115kV
Requested (queue) date2018-08-15
Proposed in-service date2018-10-31
Operational date
Withdrawn date
DeveloperGranada Solar, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata