Bluebonnet Prairie Wind (25INR0247)

Bluebonnet Prairie Wind is a 173.0 MW other interconnection project in Navarro, Texas with a current status of operational. It is proposed to connect at Tap 138kV 200 CHATFIELD - 3454 MONTFTSS__8.

173.0 MWCapacity
OperationalStatus
NavarroMarket
OtherTechnology

Project facts

Canonical nameBluebonnet Prairie Wind
Queue ID25INR0247
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketNavarro
TechnologyOther
Capacity173.0 MW
StateTexas
CountyNavarro
Point of interconnectionTap 138kV 200 CHATFIELD - 3454 MONTFTSS__8
Requested (queue) date2022-12-07
Proposed in-service date
Operational date2027-07-15
Withdrawn date
DeveloperBluebonnet Prairie Wind, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata