Bluestem Solar (AG1-447)

Bluestem Solar is a 55.0 MW battery interconnection project in Laporte, Indiana with a current status of active. It is proposed to connect at Olive-University Park 345 kV.

55.0 MWCapacity
ActiveStatus
PJMMarket
BatteryTechnology

Project facts

Canonical nameBluestem Solar
Queue IDAG1-447
Statusactive
Source statusactive
MarketPJM
TechnologyBattery
Capacity55.0 MW
StateIndiana
CountyLaporte
Point of interconnectionOlive-University Park 345 kV
Requested (queue) date2020-09-30
Proposed in-service date2023-12-31
Operational date
Withdrawn date
DeveloperRWE Solar Development, LLC
Utility / transmission ownerAEP

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata