Bluff Point 69kV (AA2-106)

Bluff Point 69kV is a 20.0 MW battery interconnection project in Jay, Indiana with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameBluff Point 69kV
Queue IDAA2-106
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity20.0 MW
StateIndiana
CountyJay
Point of interconnection
Requested (queue) date2015-04-24
Proposed in-service date2018-12-31
Operational date
Withdrawn date2018-03-13
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.