BM Great Rock Energy Center II (29INR0366)
BM Great Rock Energy Center II is a 990.6 MW gas interconnection project in Leon, Texas with a current status of withdrawn.
990.6 MWCapacity
WithdrawnStatus
LeonMarket
GasTechnology
Project facts
| Canonical name | BM Great Rock Energy Center II |
|---|---|
| Queue ID | 29INR0366 |
| Status | withdrawn |
| Source status | — |
| Market | Leon |
| Technology | Gas |
| Capacity | 990.6 MW |
| State | Texas |
| County | Leon |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2026-06-29 |
| Developer | — |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata