BOA VISTA STORAGE (1927)

BOA VISTA STORAGE is a 101.5 MW battery interconnection project in San Benito, California with a current status of withdrawn. It is proposed to connect at San Benito - Hollister 115kV line.

101.5 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameBOA VISTA STORAGE
Queue ID1927
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity101.5 MW
StateCalifornia
CountySan Benito
Point of interconnectionSan Benito - Hollister 115kV line
Requested (queue) date2021-04-15
Proposed in-service date
Operational date
Withdrawn date2022-11-18
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata