Bobcat Bluff (08INR0049)

Bobcat Bluff is a 162.0 MW wind+battery interconnection project with a current status of operational. It is proposed to connect at BCATWIND_1 34.500 (140401).

162.0 MWCapacity
OperationalStatus
ERCOTMarket
Wind+BatteryTechnology

Project facts

Canonical nameBobcat Bluff
Queue ID08INR0049
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind+Battery
Capacity162.0 MW
State
County
Point of interconnectionBCATWIND_1 34.500 (140401)
Requested (queue) date2007-02-09
Proposed in-service date2013-03-28
Operational date2013-03-28
Withdrawn date
DeveloperBobcat Bluff Wind Project LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.