Bocanova Power II (25INR0706)

Bocanova Power II is a 150.5 MW other interconnection project in Brazoria, Texas with a current status of operational. It is proposed to connect at 39030 TNMP Alvin 138kV .

150.5 MWCapacity
OperationalStatus
BrazoriaMarket
OtherTechnology

Project facts

Canonical nameBocanova Power II
Queue ID25INR0706
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketBrazoria
TechnologyOther
Capacity150.5 MW
StateTexas
CountyBrazoria
Point of interconnection39030 TNMP Alvin 138kV
Requested (queue) date2024-10-10
Proposed in-service date
Operational date2026-07-31
Withdrawn date
DeveloperBocanova Power II LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata